In combination with a Ground Screw Drilling Machine, the Highway Guardrail Pile Driver offers enhanced versatility and efficiency in the installation process. The Ground Screw Drilling Machine is used to drill pilot holes in the ground before the guardrail piles are driven. It employs a spiral drill bit or auger to create precise holes for the piles.
Item No :
TZ390Order(MOQ) :
1Payment :
T/TProduct Origin :
xuzhou,ChinaShipping Port :
shanghaiSpecification:
Item | Unit | Numerical value |
Overall dimension (L * W * H) | mm | 2700*2650*3950(working state) |
Overall dimension (L * W *H) | mm | 2700*2000*2400 (transportation status) |
Vehicle weight | t | ~3 |
Hammer model | 85 | |
Maximum oil pressure | bar | 170-2465 |
Strike frequency | bpm | 450-900 |
Drill rod diameter | mm | 76、89、102 |
Lead Cap | mm | Type C, Type H, Type O (Customized according to drawings) |
Maximum torque of travel motor | Nm | 1185-1450 |
Travel speed | mm/h | 5000-12000 |
Maximum torque of drilling motor | Nm | 2700-3300 |
Maximum stroke of guide rail | mm | 2600 |
Drilling depth | mm | 1700 |
Borehole diameter | mm | 50-300 |
Inclination angle of sliding guide rail frame | ° | Left30/right5 |
Front and rear adjustment angle of frame | ° | 15 |
Hydraulic system pressure | mpa | 16-20 |
Hydraulic system flow | ml/r | 63-80 |
Gear pump flow | ml/r | 40-50 |
Hydraulic oil tank | L | ~80 |
Diesel tank | L | 68 |
Engine power | kw | 38(Changchai engine) |
CLENT FEEDBACK
By choosing temaolian, you will not only get world-class equipment, but you will also be able to further increase your profitability, welcome to join us.
Production Process
The production process of Guardrail pile driver involves the following steps:
FAQ
Q1: Are you a manufacturer?
A: Yes, we are a professional down the hole drill rig and top hammer drill rig manufacturer.
Q2: What does your company produce?
A: The company's main products include highway piling and drilling machines, photovoltaic piling and drilling machines, and a variety of air compressors for moving work trucks.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, it depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C.
Q5: Do you offer any deals or discounts?
A: Yes, price depends on different quantity, different quantity will give you different price.
Our hours
Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)
Hi! Click one of our members below to chat on