The highway pile driver is an essential tool in the construction industry, specifically for the installation of guardrail systems along highways and roadways, contributing to the safety and functionality of transportation infrastructure.
Item No :
TZ530Order(MOQ) :
1Payment :
T/TProduct Origin :
xuzhou,ChinaShipping Port :
shanghaiHighway pile driver is a specialized equipment used in the construction and installation of guardrails along highways and roadways. It is designed specifically for driving vertical posts or piles into the ground to secure and support highway guardrails. The highway pile driver ensures the proper installation and stability of guardrail systems, which are crucial for road safety.
Specification:
Item | Unit | Numerical value |
Overall dimension (L * W * H) | mm | 2700*2650*3950(working state) |
Overall dimension (L * W *H) | mm | 2700*2000*2400 (transportation status) |
Vehicle weight | t | ~3 |
Hammer model | 85 | |
Maximum oil pressure | bar | 170-2465 |
Strike frequency | bpm | 450-900 |
Drill rod diameter | mm | 76、89、102 |
Lead Cap | mm | Type C, Type H, Type O (Customized according to drawings) |
Maximum torque of travel motor | Nm | 1185-1450 |
Travel speed | mm/h | 5000-12000 |
Maximum torque of drilling motor | Nm | 2700-3300 |
Maximum stroke of guide rail | mm | 2600 |
Drilling depth | mm | 1700 |
Borehole diameter | mm | 50-300 |
Inclination angle of sliding guide rail frame | ° | Left30/right5 |
Front and rear adjustment angle of frame | ° | 15 |
Hydraulic system pressure | mpa | 16-20 |
Hydraulic system flow | ml/r | 63-80 |
Gear pump flow | ml/r | 40-50 |
Hydraulic oil tank | L | ~80 |
Diesel tank | L | 68 |
Engine power | kw | 38(Changchai engine) |
CLENT FEEDBACK
By choosing temaolian, you will not only get world-class equipment, but you will also be able to further increase your profitability, welcome to join us.
Production Process
The production process of Guardrail pile driver involves the following steps:
FAQ
Q1: Are you a manufacturer?
A: Yes, we are a professional down the hole drill rig and top hammer drill rig manufacturer.
Q2: What does your company produce?
A: The company's main products include highway piling and drilling machines, photovoltaic piling and drilling machines, and a variety of air compressors for moving work trucks.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, it depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C.
Q5: Do you offer any deals or discounts?
A: Yes, price depends on different quantity, different quantity will give you different price.
Our hours
Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)
Hi! Click one of our members below to chat on