Hydraulic crawler drilling machine can improve construction efficiency and save labour and time cost. Its features include automated operation, precise positioning, and the ability to hit rocky layers as well as
Product Number :
TZ539Order(MOQ) :
1Power Type :
DieselPiling Height :
3.5 mDrilling Depth :
3.5 mWeight :
6000 0kgLead Time :
30 Workimg DaysProduct Origin :
1Shipping Port :
Shanghai PortWarranty :
1 YearSpecification:
Item | Unit | Value |
Piling height | mm | 3500 |
Screw pile driving height | mm | 3500 |
Drilling depth | mm | 3500 |
Drilling diameter | mm | 50-400 |
Auger drilling diameter | mm | 50-500 |
Work dimensions (L ×W × H) | mm | 3900×1900×5500 |
Transport dimensions (L×W× H) | mm | 4950×1900×2600 |
Operating weight | Kg | 6000 |
Track assembly specifications (L×W×H) | mm | 2829×2150×672 |
Track plate width | mm | 300 |
Track ground clearance | mm | 230 |
Track drive ratio | / | 1 :21.4 |
Climbing ability | % | <58 |
Working platform turning angle | ° | 360 |
Rated power | KW | 91 |
Hydraulic oil pump | Triple -pump | 50+50+32 |
Hydraulic system pressure | bar | 200 |
Hydraulic system flow | l/min | 115 |
Max.torque of walking motor | Nm | 7700 |
Walking speed | Km/h | 0-3 |
Max. torque of hydraulic motor | Nm | 12000 |
Hydraulic motor flow | l/min | 0-160 |
Drilling angle (right and left) | ° | 15 |
Drilling angle (anterior and backward ) | ° | 0-115 |
Hydraulic oil tank capacity | L | ~105 |
Fuel tank capacity | L | ~85 |
CLIENT FEEDBACK
By choosing temaolian, you will not only get world-class equipment, but you will also be able to further increase your profitability, welcome to join us.
Production Process
The production process of Guardrail pile driver involves the following steps:
FAQ
Q1: Are you a manufacturer?
A: Yes, we are a professional down the hole drill rig and top hammer drill rig manufacturer.
Q2: What does your company produce?
A: The company's main products include highway piling and drilling machines, photovoltaic piling and drilling machines, and a variety of air compressors for moving work trucks.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, it depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C.
Q5: Do you offer any deals or discounts?
A: Yes, price depends on different quantity, different quantity will give you different price.
Our hours
Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)
Hi! Click one of our members below to chat on